So how big is the mansions front yard
If your charging point is USB it won't need that big a feed to it
:):):rolleyes:
Being serious you may be better installing ducting to the points where you think you need power now for use at a later date
For me day rate pricing is when you are working labour only as a subbie on fixed days
Installing X number of downlights for a customer doesn't fall into that category for me it's X downlights will take Y hours if that fits into 3 or 4 slighty longer days then that is what I will work as working...
It depends which wholesaler you go to some have 3.75m lengths in stock and some have 3m lengths in stock and some have both in stock so it is a bit of a lottery
The likes of Screwfix and Toolstation only have 3m lengths
From the try out I had on the stand at Elex they are a good piece of kit if you are regularly clipping T&E and possibly a bit neater than the Dewalt one size fits all staples
The Viperclip stapler has a number of safety features to stop you accidentally nailing though the cable you are clipping...
An extra £90 - £100 for the fire version is a bit steep for the addition of a tiny strip of metal though
https://www.toolstation.com/viperclip-10-15-standard-1000/p11885
https://www.toolstation.com/viperclip-10-15-fire-1000/p81370
With little or no information on the electrical installation you have on site or what other electricity users there are in the locality it is not easy to make suggestions
As an example about 10 years ago I got called to a Day Nursery that had an electrical problem, the installation was on a...
Without any load the voltages will read normal as all the phases are balanced
With nothing plugged into any of the sockets the phases are still balanced
So now you have a load unless the loads are equal on all the phases the neutral point will shift (float or hang, take your pick), when this...
Have you checked for a floating neutral, that could be the cause of the problem
I've seen L - N voltages of 380v on sites where the neutral has lost it's earth reference
I've looked at it, but while the standard clips are reasonably priced the fire clips are 3 times the price
They have been at Elex this year and I asked why adding a small strip of metal to create a fire clip pushes the price up so much and the response was that the cost of product testing and...
The guy didn't actually want the investment I think he wanted £100K for 5% of the business when the dragon's startedcrunching the numbers it came to light that the guy had earned £4m already that is when he told them he didn't need the investment but wanted their marketing expertise to get him...
In what way
Some people can't do basic DIY yet want to get into a trade
Ahh the Not Very Q............. qualification
The problem is that the trade has been fragmented not just with domestic, commercial and industrial sectors so much that was bread and butter to an electrician 30 - 40 years...
I would suggest a lot depends on how the job / work process is risk assessed
One person to hold the socket and another to tighten the screws isn't really that cost effective
A lot depends on what access you have to the area above the ceiling, if you don't have any way to access the area above the ceiling it can be done with a limited amount of filling / plastering and a bit of repainting
So cost is above safety and doing the job properly
And this makes me wonder what other corners you have cut in the past, clearly with his work cost is the big factor he continues to give you the work because your cheaper than the rest because you are cutting corners / ignoring or bending the...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.