July 2002 to current, employed with BP (Baku-Tbilisi-Ceyhan oil pipeline
/South Caucasus Gas Pipeline operation)
Position: Responsible Electrical Person (REP) and Electrical coach
Responsibilities:
• Preventative maintenance, troubleshooting and corrective
maintenance of electrical systems.
• Assessment and authorization of electrical
personnel as authorized electrical person and authorized instrument
person.
• Control of electrical contractors activities.
• Coaching Electrical personal
June 1999 - July 2002 Chemical Plant (Synthesis rubber)
Position: High and low voltage Relay protection Electrical Engineer
Responsibilities:
• Leading electrical technician team of 4 people
• Commissioning a new installed relay protective equipment
• Installation, calibration, test, preventive maintenance, troubleshooting and
corrective maintenance of relay protective system and control circuits for
high and low voltage electrical systems
May 1997 – June 1999 Chemical Plant (Synthesis rubber)
Position: Forman on high voltage equipment
Responsibilities:
• Leading electrical technician team of 5 people
• Switching operation on high and low voltage electrical systems during emergency and normal situation (up to 35kV)
• Periodically inspection condition of the high and low voltage electrical equipments
• Take reading from measurement instrumentations for analyze purpose
• Troubleshooting on high and low voltage electrical circuits and systems
December 1996 – May 1997 Chemical Plant (Synthesis rubber)
Position: Electrical technician
Responsibilities:
• Preventive and corrective maintenance on high and low voltage electrical equipments
kitchen garden
-
-
1
Post a message somewhere on the site to receive this.