lads,
ive just been to price a storage heater install job up. at the minute there are 2 heaters in the property fed from a 4 way board off the ecconomy 7 time clock with re-wireable fuses. the route of my cable run is through a cupboard surface clipped, into the roof space and down the wall in trunking (at the request of the client).
Surely no RCD protection is required and all ive got to do is install 4 16amp MCB'S in the existing board (2 to replace the existing re-wireable fuses). Just double checking!.
Cheers Lads
ive just been to price a storage heater install job up. at the minute there are 2 heaters in the property fed from a 4 way board off the ecconomy 7 time clock with re-wireable fuses. the route of my cable run is through a cupboard surface clipped, into the roof space and down the wall in trunking (at the request of the client).