So I have been working on a contract installing 10.5kw showers with B40 MCB's as specified by builders but occasionally a plot reports the shower tripping when having long showers. Hager don't do a 45A MCB but do a 45A RCBO but then its the cost....£££
The cable is ran in uninsulated studwork for around 9metres to the isolator and then around 4metres to go into loft and back down. Is there a way a I can justify a B50?
Any suggestions would be much appreciated!
The cable is ran in uninsulated studwork for around 9metres to the isolator and then around 4metres to go into loft and back down. Is there a way a I can justify a B50?