Does anyone know how a full new CU would be fitted in such a cabinet, without ripping the whole thing out? Anyone ever come across and done one? It looks like no space for a new metal CU, as metal at the top impedes. Maybe move the meter to bottom right, near to where the LAP box is, but seals would then need to be broken.
The LAP box is just one 32A ring with a RCD and mcb.
The LAP box is just one 32A ring with a RCD and mcb.