Hi all
Got a PME with 6mm gas & water
Looking into the board there is 10mm gas & water it's been upgraded to 10mm.
The 6mm from the PME is still in place with the 10mm. Board was upgraded to an RCBO board. What would you do?
I have a pic
Cheers
Got a PME with 6mm gas & water
Looking into the board there is 10mm gas & water it's been upgraded to 10mm.
The 6mm from the PME is still in place with the 10mm. Board was upgraded to an RCBO board. What would you do?
I have a pic
Cheers