Hi guys
I’ve seen people state in forums that it is permissible to bond a gas pipe as a continuation of the bonding of the rising water mains. Can anyone supply proof/documentation/official guidelines etc., where this is explicitly stated.
Below is an image of what I am planning. My gas safe engineer is saying it must go directly to the MET and be bonded within 600mm of the meter, which is 7 metres away and outside in a semi submerged box.
Also what counts as visible at inspection time? It’s a rental property. Is removal of kitchen plinth and looking under the kitchen base units acceptable or will I have to bore holes in the unit?
Any help/advice much appreciated.
I’ve seen people state in forums that it is permissible to bond a gas pipe as a continuation of the bonding of the rising water mains. Can anyone supply proof/documentation/official guidelines etc., where this is explicitly stated.
Below is an image of what I am planning. My gas safe engineer is saying it must go directly to the MET and be bonded within 600mm of the meter, which is 7 metres away and outside in a semi submerged box.
Also what counts as visible at inspection time? It’s a rental property. Is removal of kitchen plinth and looking under the kitchen base units acceptable or will I have to bore holes in the unit?
Any help/advice much appreciated.