Have been asked to connect a SWA supply into a garage. The cable was ran in before I even knew about the job. No ducting as it enters the garage, been concrete poured round it as well. Then to top it off the joiner has fixed a stick to the concrete putting pressure on the cable. I’ve done IR & everything is fine. Don’t know how I feel about connecting it though. Have had to cut away some of the wood to free it up a bit. Thoughts? Pictures below.