I have perhaps done 6 rewires now. They are hard work and I wonder if there are ways to make them easier as I have another 2 much larger ones (3 and 4 storey houses) coming up.

I typically take around 2 weeks for a 3 bed house. This is working flat out (by myself) everyday including one or 2 Saturdays and I feel that is a little longer than most of you would take, or is it about right?

I have just bought the metabo mfe40 wall chaser and hopefully that will speed things up. Are there any tips for using chasers? I'm guessing they just make nice neat notches either side of the chase which you then remove with an SDS chisel? Do you always then use oval conduit which you secure to the wall with the oval conduit holders or is there a quicker way?

Cheers all and hope you are having a relaxing Saturday!

Ps.. I'm awaiting the arrival of the triple blade for the metabo, anyone use it yet? Does it actually take out the middle of the chase well?
pps.. What size conduit do you generally use for 1mm, 2.5mm, 6mm, ring etc etc?
 
Last edited:
Not on the island @JBW175 bloody miles apart....

That’a absolutely disgraceful planning mate, just to rub in, we’ve got Wall Dogs in stock....?

although I still miss going out on Albert & Palmy road, so you win that one. ?
 
Is that the Island of England or the Freezer food outlet.

I’m pretty sure that he’s on about the isle of Portsea, and not to be confused with those 6 fingered webbed feet people from the IOW.

EDIT, no offence meant for any 6 fingered banjo players from the Isle of Wight that dabble in electrics.
 
I’m pretty sure that he’s on about the isle of Portsea, and not to be confused with those 6 fingered webbed feet people from the IOW.

EDIT, no offence meant for any 6 fingered banjo players from the Isle of Wight that dabble in electrics.
The colloquial term for them is caulkheads mate.......don’t ask me why ?‍♂️?
 
The colloquial term for them is caulkheads mate.......don’t ask me why ?‍♂️?
I never knew this, but I’ve got a couple of mates off the island so will start using it as a term of endearment for them. ?
 
Another update to this thread, regarding the longevity of the metabo triple blade.
It's done a further 3 rewires now. The triple blade is removing the chases just as well as when I first started using it. Not entirely sure but I would guess at 5 rewires in total so far over the 1.5 years I've had it.

It is awesome. A standard chase for a socket (approx 2m), takes around 15 - 20 seconds, leaving a perfect chase.
 
Another update to this thread, regarding the longevity of the metabo triple blade.
It's done a further 3 rewires now. The triple blade is removing the chases just as well as when I first started using it. Not entirely sure but I would guess at 5 rewires in total so far over the 1.5 years I've had it.

It is awesome. A standard chase for a socket (approx 2m), takes around 15 - 20 seconds, leaving a perfect chase.
How hard are the walls you have been using it on?
 
How hard are the walls you have been using it on?
They have all been either red brick or stone. They do have a varying depth of plaster on them though, so you are not just going through the brick or stone at full depth. I set the depth to 20mm, this is perfect for 25mm oval conduit which sits snuggly into it and only needs 2 or 3 screws to keep it secure.

So far it does seem to have gone through anything. If the surface is a bit harder, you just go more slowly.
 
Both use 125mm blades, with 22.23mm centre.

I've looked into this a few times, but never found a definitive answer..
I was certain I'd read a reply from metabo saying you can't use it on the mfe30, but I may be wrong. Best thing for @mattg4321 to do is to contact metabo to be sure.
 
Make sure your Apprentice/Mate/Helper knows what you want of him, set yourself a target for the days work the last thing you want especially in an occupied house is panicking towards the end of the day, trying to get the place liveable until the next day some days you may finish your allotted tasks early, some you may have to work longer hours, that's a rewire for you. Three working days for me and a Mate, when I was doing it, two fairly easy days and 1 day of hard graft. You may require a 4th day for testing and snagging this was for a 3 bed occupied council house, nil chasing all surface, all cable drops clipped using buckle clips, it was a while ago mind you.
 
Aren't all Toolstations and Screwfix next to each other?
Until a year or two ago, nearest was the next town 10 miles away - next door to each other. Then Screwfix opened up in our own town (so only about a mile from home) - no Toolstation. I have to admit, as long as you know what you are after, being able to go online and (if they've got the stock in) pick it up a short time later, even on Sunday, is rather handy.
 
Back in the 80’s me & my mate did a 3-4 bedroom house in a day.
It’s a bit different now, more lights etc.
Always hard work then, flushing boxes into the walls only wet plastering then, no dabbing.
My mate flushed & fixed the boxes then helped with some of the cabling, then started the sheathing, wouldn’t wanna do this now too Old.
Good luck
 
Back in the 80’s me & my mate did a 3-4 bedroom house in a day.
It’s a bit different now, more lights etc.
Always hard work then, flushing boxes into the walls only wet plastering then, no dabbing.
My mate flushed & fixed the boxes then helped with some of the cabling, then started the sheathing, wouldn’t wanna do this now too Old.
Good luck
About 3 times as many sockets is the killer these days
 
A very basic 2 sockets and 1 pendant per room re-wire un-occupied carpet all pulled up 3 bed house, you could probably do in 1 long day between 2 experienced sparks. Bang test on the board and not a whiff of any paperwork thou.
8 til 8 shift. Sling a bit of muck in the chases if you get time.
 
A very basic 2 sockets and 1 pendant per room re-wire un-occupied carpet all pulled up 3 bed house, you could probably do in 1 long day between 2 experienced sparks. Bang test on the board and not a whiff of any paperwork thou.
8 til 8 shift. Sling a bit of muck in the chases if you get time.
Just the ticket
 
I thought I become one of those fancy youtube electricians for a minute and video myself using the triple blade, so you could see it in action. 😄

Just cant upload it though 😞

It says "the uploaded file was not a video as expected". Ummm, yes it is!

Sussed it! Trimmed it a bit and it works. I love the triple blade!

Ps.. It takes longer than the previous 20 seconds I said. Looks like it's around 45 secs - 1 min for a chase to a light switch. Virtually no debris and a lovely, neat chase. This is into a standard load bearing wall in a house, not sure exactly what material it is I'm cutting into, but it's pretty hard.

pps.. No eye protection 😞
 

Attachments

  • Triple blade_1 - Copy_Trim2.mp4
    12 MB
Last edited:
I thought I become one of those fancy youtube electricians for a minute and video myself using the triple blade, so you could see it in action. 😄

Just cant upload it though 😞

It says "the uploaded file was not a video as expected". Ummm, yes it is!

Sussed it! Trimmed it a bit and it works. I love the triple blade!

Ps.. It takes longer than the previous 20 seconds I said. Looks like it's around 45 secs - 1 min for a chase to a light switch. Virtually no debris and a lovely, neat chase. This is into a standard load bearing wall in a house, not sure exactly what material it is I'm cutting into, but it's pretty hard.

pps.. No eye protection 😞
I really must get my finger out and purchase one to try it...my MFE40 is over 3 years old now and all that's been used in it are the Metabo's standard blades. Trouble is in that time we've gone through over 30 pairs of blades, I just have this bad lingering doubt that the triple blade wouldn't be able to last any length of time when it's doing deeper tracks...we'd regularly be sinking some 25mm conduits in kitchen jobs for isolators all to go in tall housings etc...and we do that kind of work pretty regular.

I've a couple of big new builds starting soon but I get tracking companies in for that work😆
 
I really must get my finger out and purchase one to try it...my MFE40 is over 3 years old now and all that's been used in it are the Metabo's standard blades. Trouble is in that time we've gone through over 30 pairs of blades, I just have this bad lingering doubt that the triple blade wouldn't be able to last any length of time when it's doing deeper tracks...we'd regularly be sinking some 25mm conduits in kitchen jobs for isolators all to go in tall housings etc...and we do that kind of work pretty regular.

I've a couple of big new builds starting soon but I get tracking companies in for that work😆
I have the MFE30 and find it sore enough on the blades. Would like to try the MFE40 though to avoid needing to knock the centre of the tracks out.
 

Reply to Any advice on rewires? in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

And if it's a garage then use metal clad accessories.
Replies
5
Views
353
  • Question
Obviously not a building/DIY forum so will keep it short but yes - we've taken all the floors up. Several joists in the bathroom need doing as...
Replies
8
Views
1K
  • Question
My MFT has just been calibrated before anyone asks :)
Replies
19
Views
2K
  • Question
How did it go?
Replies
12
Views
2K
  • Question
Take your photo on phone. Screenshot it to replicate it, then crop out the excess screen. Brings the image file down to a reasonable size. Was...
Replies
4
Views
957

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks