Got an EICR testing to do on a site soon. Some was done 2018, some 2014... but their office cant find the reports... So got to start from scratch on mapping out circuits.
There's 2 holiday cottages, half a day each. Modern RCBO consumer units. A cafe with some 3ph equipment, A workshop for the gardener/handyman and a little shop all in one courtyard.
Then there's the office, and a couple of self contained flats above, which i believe were last tested in 2020.. so can be left for now.
Then there's this.....
so far i've found 12 old fuseboards.... only a few have been "upgraded" to mcb. There must be more as they're labelled A,B,C,D etc... and i cant find E, J or L
Apart from the cottages, everything is a mix of singles in conduit, MICC, T&E........ Rewirable fuses, cartridge fuses, Old SquareD Qo type breakers (the black ones).....
There are rooms off staircases that don't appear on any of their plans... other doors that have been locked off for decades and the keys have disappeared. (there's a story there for another time)
And it all needs to be done before they open to the public at Easter.
There's 2 holiday cottages, half a day each. Modern RCBO consumer units. A cafe with some 3ph equipment, A workshop for the gardener/handyman and a little shop all in one courtyard.
Then there's the office, and a couple of self contained flats above, which i believe were last tested in 2020.. so can be left for now.
Then there's this.....
so far i've found 12 old fuseboards.... only a few have been "upgraded" to mcb. There must be more as they're labelled A,B,C,D etc... and i cant find E, J or L
Apart from the cottages, everything is a mix of singles in conduit, MICC, T&E........ Rewirable fuses, cartridge fuses, Old SquareD Qo type breakers (the black ones).....
There are rooms off staircases that don't appear on any of their plans... other doors that have been locked off for decades and the keys have disappeared. (there's a story there for another time)
And it all needs to be done before they open to the public at Easter.