I have a question regarding the potential replacement of my existing EON supplied ELSTER A1140 3 phase meter which is currently providing E10 switching times for our all electric home.
The house has an old electric storage boiler and the system is set up such that I get 10 hours of off peak electricity for the boiler and one of two immersion heaters and also the rest of the house.
During peak times the house except boiler and immersion heater are use the higher rate.
This is an old Heatwise system from 2000.
EON Next have not been very helpful to clarify whether changing to a smart meter will give the same functionality as the existing system with 10 hours off peak supply and have an IHD or whether this would be different.
They just want me to book a smart meter install.
From other posts on this forum I understand that EON Next could replace my meter with a EDMI ES-30B 3 phase smart meter.
Does anyone on the forum have experience of such a change in a 3 phase system and whether this is straight forward.
Would the same off peak times be retained with such a change etc.
I know smart meters are the way forward but I have seen too many posts of home owners who have had problems following a change and I do not want to be one of them.
I have attached a couple of pictures of my meter and CU install, hopefully this will help.
Thanks
Peter
I have a question regarding the potential replacement of my existing EON supplied ELSTER A1140 3 phase meter which is currently providing E10 switching times for our all electric home.
The house has an old electric storage boiler and the system is set up such that I get 10 hours of off peak electricity for the boiler and one of two immersion heaters and also the rest of the house.
During peak times the house except boiler and immersion heater are use the higher rate.
This is an old Heatwise system from 2000.
EON Next have not been very helpful to clarify whether changing to a smart meter will give the same functionality as the existing system with 10 hours off peak supply and have an IHD or whether this would be different.
They just want me to book a smart meter install.
From other posts on this forum I understand that EON Next could replace my meter with a EDMI ES-30B 3 phase smart meter.
Does anyone on the forum have experience of such a change in a 3 phase system and whether this is straight forward.
Would the same off peak times be retained with such a change etc.
I know smart meters are the way forward but I have seen too many posts of home owners who have had problems following a change and I do not want to be one of them.
I have attached a couple of pictures of my meter and CU install, hopefully this will help.
Thanks