Job that was on the to do list, got round to it the other day. Three gang switch with a few lights connected together in the same switch.
Surveyed the job lucky all wiring went back to the switch LN in there too.
Got double dry lined box 6 gang switch linked all commons up and gave SL to each switch took me less than an hour happy days.
Surveyed the job lucky all wiring went back to the switch LN in there too.
Got double dry lined box 6 gang switch linked all commons up and gave SL to each switch took me less than an hour happy days.