Hi guys,
I have my am2 resit this week, I just done the pre assessment day and I was told that the sy cable needs to have a lock nut either side of the gland. So two lock nuts on each side.
So one to lock down the two washers and then one to lock them together in the box...in the videos online they just use the lock nut on the inside of the box.
Could some one please assist
I have my am2 resit this week, I just done the pre assessment day and I was told that the sy cable needs to have a lock nut either side of the gland. So two lock nuts on each side.
So one to lock down the two washers and then one to lock them together in the box...in the videos online they just use the lock nut on the inside of the box.
Could some one please assist