For the FP200 co2 dectector circuit, does the fp200 need to be seperated from the mains? I remember installing some on site once and it had to be segregated then and i was going to install it like that today. then noticed the dado trunking didnthave any holes to the fuseboard in the bottem or top section
AND for the motor circuit how do you set the overload? never worked with motors or anything so not sure and never heard of anything like this need doing in the past! wish i had.
AND for the motor circuit how do you set the overload? never worked with motors or anything so not sure and never heard of anything like this need doing in the past! wish i had.