got called out this morning to a rcd fault on a high integrity board.. identified this to the heating system (supplied via fused outlet).... frfom there i idendified dead short N- cpc to boiler.. opened the boiler to find this... considering that BRITISH GAS ENGINEER had been to fully service the boiler YESTERDAY..!!!!!!!!!!
how can this engineer leave the boiler like this???? the supply flex was wedged in aggainst the burner!!! elderly gentleman in his 90 this was for.. ive printed him off a copy of the photo and reccomend he complaing strongly!!!!!!!!! should the engineer recomend that the supply for the heating system be a doulbe pole isolator?? i have changed it now but thought the engineer should have sheets to fill for this sort of stuff like we have!!
how can this engineer leave the boiler like this???? the supply flex was wedged in aggainst the burner!!! elderly gentleman in his 90 this was for.. ive printed him off a copy of the photo and reccomend he complaing strongly!!!!!!!!! should the engineer recomend that the supply for the heating system be a doulbe pole isolator?? i have changed it now but thought the engineer should have sheets to fill for this sort of stuff like we have!!