Wiring a new build of 5 flats , the services are being brought in with plastic for water and the gas is also in plastic . After the stop cock the gas is being fed to each flat with Trac pipe which is stainless still roll coated in thick plastic, any ideas on bonding to this ,apparently plumber said any exposed stainless surface must be covered in silicone.
I was going to strip back plastic and bond to the stainless pipe then retape exposed pipe, but would this be classed as a plastic pipe??
Flats are approx 10 meters from incoming supply's fed with amoureds and switched fused.
Also could i cross bond all five incoming gas supply's or run five individual cables to save time.
Supply will be pme
I was going to strip back plastic and bond to the stainless pipe then retape exposed pipe, but would this be classed as a plastic pipe??
Flats are approx 10 meters from incoming supply's fed with amoureds and switched fused.
Also could i cross bond all five incoming gas supply's or run five individual cables to save time.
Supply will be pme