EICR codes spreadsheet | on ElectriciansForums

Discuss EICR codes spreadsheet in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Joined
Dec 13, 2012
Messages
17
Reaction score
0
Location
manchester
Hi everyone, been thinking of putting together a spreadsheet or list of the most common faults found doing EICR's. I was going to start with the ESC best practice guide, now I know a lot of this may be objective to the individual but has anyone started anything like this ? Maybe it's something we could put together between us all and try and bring a bit of consistency to it.ThanksSteve
 
Hi everyone, been thinking of putting together a spreadsheet or list of the most common faults found doing EICR's. I was going to start with the ESC best practice guide, now I know a lot of this may be objective to the individual but has anyone started anything like this ? Maybe it's something we could put together between us all and try and bring a bit of consistency to it.ThanksSteve

That'll help the fast track boy's no-end. It would probably be just as helpful as a spead sheet telling/listing for them what NOT to code!! ...lol!!
 
I went to a job on wednesday after a EICR was done by someone else.

This is what he had put as the codes.

1) New 17th edition board needed C2

2) 45 A fuse on 6 mm cable overheating C1

3) 6A fuse with 4 cables in should be split to 2 fuse C2

4) Main earth should be 16mm C3

AND THE BEST ONE

Cant get insulation readings on sockets or lights( FI)

The reason he had put for the PIR was SAFETY INSPECTION.

I found this in the bathroom.

[ElectriciansForums.net] EICR codes spreadsheet [ElectriciansForums.net] EICR codes spreadsheet

Now this was a fire risk !!
 
Last edited:
Before anyone asks I did make the place safe by installing a new fitting.

The 6mm cable feeding the shower was actually 7/036 and the shower was 10.5 kw so that was isolated.

The IR tests on the ring finals were fine once all the loads were disconnected !
 
i think the shower situation is borderline if cable is not derated due to insulation. a clamp meter would probably tell you that the actual current drawn is within the ccc of 7/036.
 
Was asked to look at an EICR a couple of weeks back marked as unsatisfactory which was done by a sole trader for a friend of a friend.

The only observation was no RCD on circuits C1 along with a price to rectify of ÂŁ4900

Had a quick visual of the job which is on the 3rd floor and is a small office installed in 2002. PIR carried out in 2007 and no issues. Then this cowboy seems to think that RCD's / RCBO's are now necessary. This is just another uneducated thieving scumbag that want's to make an easy few quid.

Rant over
 

Reply to EICR codes spreadsheet in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
323
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
851
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
973

Similar threads

I own a top floor tenement flat that I used to live in and then rented out after I married. It is currently empty whilst some work is being done...
Replies
0
Views
582

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top