Rotten Mob

Doing an office fit-out, it's an alteration and an addition to the existing installation.

However in the section for Particulars of the Installation referred to in the Certificate it asks of for the details of the Main Switch, earthing, maximum demand etc, which I don't have.

Do I need to fill these in or can I just put N/A?
 
Doing an office fit-out, it's an alteration and an addition to the existing installation.

However in the section for Particulars of the Installation referred to in the Certificate it asks of for the details of the Main Switch, earthing, maximum demand etc, which I don't have.

Do I need to fill these in or can I just put N/A?

Wind up ?
 
It's a huge office, client is renting one floor from the the owners, BT, who are no help at all. I am trying to source the original info from the FM people but it's like drawing teeth and getting access, keys, etc to survey the installation is a nightmare.

I've only ever signed off new installations so it's never been an issue for me before.
 
Fill out what you can and make a note on the certificate the reasons why the information could not be obtained.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Help needed with NICEIC certificate
Prefix
NICEIC Certification Scheme 
Forum
Certification NICEIC, NAPIT, Stroma, BECSA Forum
Start date
Last reply date
Replies
11

Advert

Thread statistics

Created
Rotten Mob,
Last reply from
Toonlad,
Replies
11
Views
5,226

Advert

Back
Top