OP
KINKY
Theproblem I have with such a method, is that would not show whether the Luxlevels are sufficient. Only by interupting the normal supply could that beassessed.
Yeah see what you’re saying.
In an ideal world lux levels should be checked once, when the system is installed and following any alterations to the system or building.
It is not recommend by BS5266 to check lux levels on the routine service & maintenance intervals.
Last edited by a moderator: