V
vb6951
Hi guys,
I need some help with pricing a job please.
property info: 3 phase 400V supply. 4 levels. 8 Bedrooms (5 with on suit, 3 with out), 1 x lounge, 1 x dining room, one individual bathrooms and entrance hall & landing.
full rewiring, including 1 x TP&N board, 1 full loaded RCD CU, 5 x 2 way RCD CU and all bondings
8 x bedrooms: 4 x sockets, 2 x lights, 2 way lighting, 1 x Ethernet, 1 x TV, 1 telephone
6 x bathrooms (including 5 on suits): 1 X Light, 1 X LED Down Light, 1 X Mirror Light, 1 X Shaver Socket,1 X Extractor Fan
1 x lounge : 6 X Socket, 1 X TV, 1 X Telephone, 1 X Light Switch, 2 X Pendant, 2 X Audio Point (Speaker)
1 x Dinning room: 6 X Socket, 1 X TV , 2 X Light,1 X Switch (Lighting)
Landing & Hall: 6 x Socket, 5 X Switch (Lighting), 1 x door bell, 2 x external light, 14 X Wall Light
10 x Audio Point (Speaker) throughout the property.
.
Thanks in advance
I need some help with pricing a job please.
property info: 3 phase 400V supply. 4 levels. 8 Bedrooms (5 with on suit, 3 with out), 1 x lounge, 1 x dining room, one individual bathrooms and entrance hall & landing.
full rewiring, including 1 x TP&N board, 1 full loaded RCD CU, 5 x 2 way RCD CU and all bondings
8 x bedrooms: 4 x sockets, 2 x lights, 2 way lighting, 1 x Ethernet, 1 x TV, 1 telephone
6 x bathrooms (including 5 on suits): 1 X Light, 1 X LED Down Light, 1 X Mirror Light, 1 X Shaver Socket,1 X Extractor Fan
1 x lounge : 6 X Socket, 1 X TV, 1 X Telephone, 1 X Light Switch, 2 X Pendant, 2 X Audio Point (Speaker)
1 x Dinning room: 6 X Socket, 1 X TV , 2 X Light,1 X Switch (Lighting)
Landing & Hall: 6 x Socket, 5 X Switch (Lighting), 1 x door bell, 2 x external light, 14 X Wall Light
10 x Audio Point (Speaker) throughout the property.
.
Thanks in advance
Last edited by a moderator: