I got sent to a job today to move a 110v to above a newly buitl workbench which has is going to have 2 mitre saws
when i got the there where 10 * 16A(5 doubles but each outlet has its own feed) outlets from 1* 5kw fixed transformer with only 2 legs coming directly from so then i thought it must ring(don't really know if this is the done thing considering there is no secondry protection) but it turns out it 2 radails 5-5 with the one needing moved the last leg in each i think its previously been a ring as the middle in the outlet has been drilled out to put a link leg
1. Should i make i ring again
2. should i add secondary protection on the 110v side of the installation some sort of double pole MCB
https://encrypted-tbn2.gstatic.com/...q8OBzcJEaZtRRpzcgVDntjl266XsjJ-hiis_ksSJXV34A
when i got the there where 10 * 16A(5 doubles but each outlet has its own feed) outlets from 1* 5kw fixed transformer with only 2 legs coming directly from so then i thought it must ring(don't really know if this is the done thing considering there is no secondry protection) but it turns out it 2 radails 5-5 with the one needing moved the last leg in each i think its previously been a ring as the middle in the outlet has been drilled out to put a link leg
1. Should i make i ring again
2. should i add secondary protection on the 110v side of the installation some sort of double pole MCB