Got an odd set up in a Kitchen, which just seems wrong but I can't convince myself why its wrong, other than bad practice. There is a final ring, serving 4 outlets on one side of the kitchen, which is then spurred, using 6mm, to another, small ring with 3 outlets. Previous installer obviously used a redundant cooker feed rather than running new. Now, I do intend to rewire it conventionally, but what exactly is wrong with it? Only thing I can find is that each circuit should have it's own PD, but it's only one circuit really? And even if it is classed as 2 rings, there is nothing to say they couldn't be fed off the same PD, even if it's a c**p idea. Surely the 6mm is just acting as the parallel conductors of a ring, it can quite easily handle the max load the PD will allow?