the sub board is for a static caravan fed from a 3 phase board in a garage 137 meters away the cable will be surface 25 mm 2 core swa fe from a B50 ib did the maths and it worked out that iam not within the limits was just looking for advise thanks a lot guys sorry about the way i asked the...
2 inter, 1way this all goes back to a massive joint box get what he means now sorry if a wasted time by not fully letting use understand love the site great advice and i really do appreciate it as an apprentice this helps me loads
this is what he had.
he had a 3 gang toggle switch. this is the wires he had at it 3 x 3 core into the first switch he had 1 x 2 core and 1 x 3 core into the second switch in the 3rd toggle he had 3 x 2 core doing 3 no of lights had a feed in and linked them all joint all neutral at switch...
hi there can anyone show me a dundee 2 way journeymin was showing me today bits and bobs of it bit i would like to get the full understanding of it as he he was showing me quickly thanks
yeah say we are using contactors has everything to be de-energised via the contactor or is it only certain things to be de-energised the ones iam doing are diffrent than normal... as they need a constant feed to the flat door for it to open so its normally an open circuit that is closed when the...
it is s firmans switch in a block of flats i thought they just dropped the magnet from the door so they can get in but does much more the contactors would make sence but does it kill the power to the whole block
hi there iam just looking for a little advice on fireman switches on how they are wired and how they disconnect power cant find anything so just a little post here thanks for your time
I agree with the swa being earthed if you ran the cable from your house protected by a b32 and got a small metal 2 way consumer unit with a b6 and b16 b6 for the lighting and b16 for the socket it’s saves you spur of the socket with a fused spur for the lighting (just an apprentice)
Iam an apprentice I do everything for my journeymin (but whipe his a@@rs)
When going to jobs try to get in your head what materials you is needed for the job I set everything up ladders etc so he can just do his job after job is done tools are back in the bag ladders are away on the van final...
i just used to revise and revise the TMA and look in books aswell i done it that way would recommend doing it the way your doing it worked for me hope all goes well mate good luck