Thanks guys for your replies. It's no problem to do 10 years instead of 7. As said, I'll stick them in a box in the garage. I think if an ex client approached me now about an old job, I'll be suffering from dementia! 😁
Due to retirement - Domain Name is 5 Star Electrical Services
Electrical stock is typical for an Electrician living in the sticks near Southam, Warwickshire.
Comprises of Cable various, Trunking and fittings, Conduit and fittings, Installation boxes, Junction boxes - internal, Wiring...
I would need 2 Switchfuses as it's E7. I'm doubtful that there's room in the meter box for 2 switches. If you cost fitting 2 Click DB750 switchfuses against supply and fitting new RCDs, the latter wins hands down!:) I think that the slightly too long tails may not be noticed! I'm also thinking...
re Item 2. So the original installation was wrong. Should've thought about it more at the time I changed to RCDs! Got so used to buying CUs with 100 Amp Main Switches as standard whether that rating was required or not and never having to question it.
1597873036
Hi Matt
I think davesparks is...
Hi Guys
A first floor flat I rent out requires an EICR. It was purpose built in 1990. I'm no longer in business or up to date with regs and realise that there may be some issues lol.
The meter box and cutout (100Amp) feeds the Main CU and an E7 CU installed in the flat on an outside wall inside...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc