  1. M

    PV Installations

    Thank you fo your replies
  2. M

    PV Installations

    Just wondering how many people you all have on an installation?
  3. M

    Finishing up my first job.....

    I would be very greatfull as well [email protected]
  4. M

    Meter tails

    Exactly correct Johnboy
  5. M

    Meter tails

    So if in a commersial premisses where you have 400A head fuses feeding a buz bar chamber, are you saying all cables coming from it require sizing to 400A to feed various distribution board located at various locations around the building..Of cause not because the overload protection is provided...
  6. M

    Meter tails

    Thats exactly what i am saying it is protected by the load
  7. M

    Meter tails

    Now you are talking about somethig different, I stated that it was protected against overload which it is, you are now talking about short circuit protection even so the answer would be yes the 100A head fuse would blow under short circuit conditions Thanks
  8. M

    Meter tails

    Hi this makes no difference as the maximum that the 10mm cable will carry will be dictated by the 16A mcb on the load side, the same can be said for a spur from a ring main ie Cable Max 27A Breaker / mcb 32A Cable is protected by the plug top fuse 2 x 13A = 26A
  9. M

    Meter tails

    This would be alright as Its protected against Overload by the 16A mcb
  10. M

    Two Inverters

    Sorry Mark, they are both sunny boys
  11. M

    Two Inverters

    Thanks for your reply Mark, would the inspector have any isues with access to the mcb's being in the loft? If not i can install a two way board as you have suggested and then an armoured cable from this to the distribution board via a generation meter in the garage. Its our first install and i...
  12. M

    Two Inverters

    Because the panels are facing different orientations ie 6 are on a roof facing south and 11 facing east
  13. M

    Two Inverters

    Can no one help, i have seen another post where this has been done on two different orientations, but in sunny boy instruction it says it must be on own mcb? Help please have install to start next week
  14. M

    Two Inverters

    I have an install of a 4kW system for my mcs accreditation with 6 panels on a South facing roof and 11 panels facing east. I have two inverters one for the south facing panels and one for the east, my question is can I join the ac output from the inverters together into a junction box then to...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top