Oh so true, it's 40 years ago since I did any trig in tech during my apprenticship, but last week I actually had to drag it out from the recesses of my remaining brain cell to calculate the current in the neutral on a facility and use graph paper.
My head was spinning after a while, would...
So you want to rewire the installation for 3 phase supply, what voltage do you want to work at 400V LL or 415V LL, you need to take in account load balancing so its not just a case of installing a 3 phase panel board or DB and connecting the final circuits in hope.
If you can split the loads...
Fairly common with cheap LED lamp drivers, to make life easy, connect non LED lamp and see does it happen. then check your reading again, if they are clear and the RCBO doesn't trip then you know the LED driver is the problem.
You will only drive yourself around the bend
here's the result of a numpty damaging a brand new voltage stabilizer by getting the 3 phase connections on a generator wrong, and its all marked R,S,T,N. Connected a phase output line to the neutral and neutral to a pahse so it put two phases through the master rotavolt controller and left...
May I suggest a rephrasing of the requirement? At the moment you are seeking a sequencer which will on the push of a button start up plant 1, then plant 2...and finally plant 6. Is this always what you want to happen?
Close, I need the delays on each AC starting up to allow the diesel generator...
Schneider/legrand are rip off prices on everything, everywhere.
Schneider took over APC and their prices for spares went through the roof,
2.2 Mtr 3 compartment Schneider PVC trunking with out dividing fillet or cover $38 if complete with fillets and covers then it hits £48
MK consort...
Guys,
Hi, need some advice on sequential timers.
I need to set up 6 containers with 2 ton (24,000BTU) Inverter Split Air Conditioner units supplied through individual contactors, I am looking for a sequential timer that can allow me to space a starting sequence of 15 seconds between each...
here's a good one, this was the MDB for a warehouse complex with 20 warehouses, 3 office blocks, on the right is the Utility supply incomer cabinet.
6 weeks solid work to replace and fix this up.
We replaced with a 250amp 250 TPN eaton load centre, steel trunking cable managment, new SDBs...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc