Yep, a lenovo laptop for the wife, came next day, no issues. It was so good a bought another one few days later for myself, again delivered next day, no issues. If you have any concerns buying from unknown online shops always use credit card as transaction can be reversed
It's 3.3Ghz
https://www.amd.com/en/products/apu/amd-ryzen-5-5600h
I own laptop with Ryzen 7 5800H which is very similar to this one but with 2 more cores and i find it very fast and responsive
You are going up with price every post, in that case consider this one:
https://www.box.co.uk/M1503QA-L1119W-ASUS-Vivobook-15X-AMD-Ryzen-5-16GB-RAM-5_4321761.html
It will give you couple more cores, even more clock speed and great screen.
And in case you buy laptop with windows in S-mode...
That's spot on. Laptop with that specs should comfortably run what HHD want. My old laptop circa 8yr old with less specs then that one in the first post could do all that and more comfortably.
Its unbelievable how much c..p is installed on those retail laptops, free trials of everything from...
@HappyHippyDad
This laptop will comfortably do what you need and little bit more. Is it reasonably priced, probably is, considering you will have some warranty with it, and you can be sure battery will be 100% unlike with used laptops, also you will be sure how much crumb, coffe and all sort of...
I don't know this inverter but if you set up correctly all the parameters (max voltages, capacity, etc) then inverter and battery bms should work out correct charging/discharging current. For example if you set total capacity at 4800W or 100Ah then charging/discharging at 0.5C would be 2400W but...
Us5000 batteries have nominal voltage of 48v and nominal capacity of 4800W. Maximum charge discharge is 100A (4800W/48V) this is called 1C (your battery is charged/discharged from 0-100% or 100-0% in 1hr). You should avoid charging/discharging at 1C and use 0.5C which in this case is...
Yes, when you make application you use inverter output regardless of the storage or array size.
With this scenario I believe you would add together output of all existing and proposed inverters and choose appropriate form (g98 or g99) on which you would list existing and new inverters.
As above Sub contractor way is bit easier then taking them on payroll, however when taking sub contractor on, technically you still have to do it under construction industry scheme and take deduction and pay to hmrc. All it takes is few clicks every months with your chosen software (I use bright...
Every PV installation should be properly designed and tailored to customer requirements/budget to get most out of it. Since regulation changed, you can install 32A inverter with G99 SGI-1 as "install and notify" as long as export is limited to 16A within device settings.
Your PV system should never be fed by shared RCD. At the moment your additional protection is compromised by this. To rectify this you need to swap main rcd for main switch and replace mcb's for Rcbo's or replace whole consumer unit.
It was mention earlier on, if you registered with competent person scheme then they will provide system for you to do it - usually online. If you hire third party certifier then they will do it on their system, or if you use building control directly they will take care of this internally.
No, it is not. It's just certificate with all the test results, installation details and inspections. Compliance certificate is 1 page document stating details of the installer, installation address, eic number for this installation, date of which the work has been completed and description of...