Can't be much more "assured" than having heavy gauge screwed steel pipe. As for Csa equivalent pretty sure I'm good there too if 32mm conduit is equivalent to a 15mm2 copper cable.
Hi,
Scenario, Oil service to a church boiler is at the furthest point to the distribution board. Rather than run a separate bonding conductor to the oil service I've decided to bond the 3" cast iron heating pipework local to the DB then take a fly lead at the boiler from the CH pipework to...
Bletchley is fantastic, I've been twice now and seeing the Bombe machine in the flesh is something special for those like me with a passion for engineering.
Hi all,
I want a 18x10 shed/workshop to keep the bike and general stuff in however the sheds on the market are either overpriced or clad in wafer-thin timber. Anybody built their own and how did you go about it?
Cheers :smile:
I moved into industrial maintenance last year and its almost a different world to contracting. The pressure is intense when production is stopped but its also really satisfying when you get it back up and running. At 24 I've got so much to learn but I'm thankful that the firm took a chance and...
Wondering what the options are for upgrading/replacing 90w SOX streetlights. All ours are remote control gear in the base of the posts. Pain when you have a dual lantern post with 2 sets of control gear in the base, just no room to get at it without dropping the cuttout and backing plate out...
If you are clamping line and neutral your are only measuring earth leakage current. Current draw for a standard 2.2kw kettle should be higher than 0.56A.
I would start first and see what the job is like, you'll soon get a feel for what you need. I certainly wouldn't be spending large sums of money on 240v corded gear.
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc