Well, I'm a little overwhelmed here. Been over today to change rcd, test and commission the lights.
Getting some strange problems and I dont know if I'm missing the obvious. I cant think straight now. So here's the story.
As said earlier, I had a neutral on the switch return of 1 of the PIR...
Installed some new floodlights/pir and switches today. All tested fine, however on power up it was evident I had got something wrong. Upon investigation I had the neutral in the switched live of the PIR. Kicked myself but mistakes happen.
Corrected the mistake but still nothing was working as...
I need to bring some flex cables through so corrugated metal sheeting which is on the upper side wall of an industrial unit.
This is to supply some floodlights. I'm unsure what is the best way to go through the corrugated sheet. I dont want to use a compression gland with flex as I think that...
Iv purchased 3 of these
https://robus.com/catalogue/product/motion-detector-180-black
2 will need to be linked to control the front 3 floods. The other will operate tbe other 2 side lights.
The front of the building is corrugated steel. What's the best way to bring supply from behind into...
https://www.dropbox.com/s/ijilw5dmmexanzr/ebb64eee-a31c-43ca-9bd5-bc91b2d55699.PDF?dl=0
These danlers look pretty good.
Not sure on the 20mm bottom entry option. I hope you can do back entry and use the bottom 20mm as a gland for the load
Father in law picked his new BMW X5 phev.
Previously he had a 330e hybrid on loan whilst he waited for the X5.
With the 330e he charged the vehicle via an exterior 13A socket and the vehicle battery was 100% charged. The battery on that vehicle was a 2.4KW battery and a 2.4KW charging unit...
Got a small job to do for my father in law. 5x led floodlights around the front and side of his works unit.
He wants the ability to turn the lights off from 2 switches ( 1 for the 2 side lights and 1 for the 3 lights on the front) inside the unit. He wants the lights to be on a 2 motion sensors...
No its within a university. Dont see what the problem is. The SWA are too low in tbe column to make into the cutout but just enough room to make off into a wiska box. The 1.5mm ho7 flex is about 500mm max in length, just enough to reach the cutout which sits above the wiska box.
Both SWA...
Upgrading lamp post cut outs. 2x6mm SWA incoming but too short to make off into cutout so making off into JB. Small 500mm section of 1.5mm ho7rnf into cutout. 6A fuse in the cutout
Anyone had any issues getting 6mm into the 0.5mm-6mm wago's?
It's a real struggle getting the conductors into the terminals but the biggest problem is, when 2x6mm are in, a 1.5mm goes in and just falls back out again. The levers feel real stiff.
It's not a comfortable fit. This is a 3 way wago