Search results | Page 10

Search results

  1. 7029 dave

    Wiring diagram help needed

    The OP is specifically asking using 3 core and earth for the switching
  2. 7029 dave

    Wiring diagram help needed

    Think of your strappers as a metallic path from you first 2 way switch to the other, the intermediate in the middle or as many as needed, your common wire has to be a dedicated wire from end to end. Just a few pointers now have a go and draw it up.
  3. 7029 dave

    Hi everybody, I'm Dan. :) I'm back.

    Yup the black search dot is a pain
  4. 7029 dave

    1mm attached to a 20A circuit

    Then this 1mm is interconnected somewhere
  5. 7029 dave

    Just to introduce myself

    Long time no see, good to see you
  6. 7029 dave

    Just to introduce myself

    Welcome along to the forum
  7. 7029 dave

    What limations do you put on a Eicr.

    IMO regarding these reports, its all about observation with what you are seeing with your eyes ( very good tool) If the installation on the whole is looking good any sockets you take off, light switches, drop any light fittings etc all fine then no need to take every single one off. Its called...
  8. 7029 dave

    Repairing imperial mineral cable

    With Gland couplers and bush would make it a tad lower
  9. 7029 dave

    Repairing imperial mineral cable

    How the hell did that 3rd core snap off
  10. 7029 dave

    Repairing imperial mineral cable

    Can you still buy them, struggled to find them got a pic to show other members if they haven't seen them before.
  11. jpeg micc.jpeg

    jpeg micc.jpeg

  12. 7029 dave

    Repairing imperial mineral cable

    No idea , I do remember Pyrotenax's heatshrink pot/ seals but never used them.
  13. 7029 dave

    Repairing imperial mineral cable

    I keep looking at the picture and it looks like 2L1, even with the wiring configuration N's connected together in back box ? Perm Live in Common S/L out ? But hey am not there if you say 3core okay. Silly question I take it the light/ lights dont work? Could be a 3L1 disc but have only potted 2core
  14. 7029 dave

    Repairing imperial mineral cable

    Petrol stations
  15. 7029 dave

    EICR Inspection Issue

    Rewire would be the best solution
  16. 7029 dave

    EICR Inspection Issue

    Yes pre 1966 lighting circuits did not have to be earthed
  17. 7029 dave

    EICR Inspection Issue

    I think the tester was quite lenient, class 1 fitting on a lighting circuit with no cpc would be a C2 . Even if you changed to class 2 it would still attract C3 All lighting circuits should be earthed.
  18. 7029 dave

    Repairing imperial mineral cable

    MICC is classed as a specialised job these days, unbelievable it was once an everyday task for any Electrician back in the day.
  19. 7029 dave

    UK Why is it so quiet??!

    With the cost of living going through the roof many people are putting these kind of jobs off.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top