temporary rewire sections between sockets (on the outside of the walls) leaving existing disconnected, until you get continuity and then narrow down the break. You could use a long lead and just go between CPCs
Are you testing ring continuity? What are you results? Why did you decide to disconnect everything from earth bar? What is the circuit wired in? I have so many more questions on your testing methods as they seem a bit random
You could fit a gas boiler and supply it with 10mm cable from CU so the option is there to switch to electric at a later date.
Or install both and have the best of both worlds
That’s is up and working. Used an app called dish align to set it in the right direction then was a mix of using a sat finder and the tv to get a good signal.
Thanks Matt exactly the information I need. I have re aligned one before in a very difficult area (wrong side of a hill and a big radio mast in the way, got it eventually). The pole it’s on is in good condition so just going to re use that. Also need a 4 quad LNB, I see they are available on...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc