Search results | Page 7

Search results

  1. buzzlightyear

    CCTV colour at night alternatives.

    All most cctv made by Mr loo in China. I bet the commie laughing has I'm righting to this post.
  2. buzzlightyear

    CCTV colour at night alternatives.

    I always used hic vision, dis what USA saying about the Chinese. I have ordered a peking duck on the cctv Bloody hell they where quick to deliver it on time.
  3. buzzlightyear

    What is it on this fault

    Well I can now tell you, the bg mcb had not tripped no faults where found, it some how to stay on, but the machanics.inside flipped,
  4. buzzlightyear

    Feeding LogCabin from Shed CU

    Sub ing off a 6mm not very practical. SWA cable average 46 amps, depends how it installed.
  5. buzzlightyear

    Zs measurements in the Cert column

    It’s actually in the column Max permitted Zs for installed device ie: MCB 60898🤖 What the regs say what mcb you have installed.
  6. buzzlightyear

    What is it on this fault

    Main switch on. should have put that on list. Had me thinking. Will put it on the end of the day what the problem was.
  7. buzzlightyear

    Zs measurements in the Cert column

    Are you testing TT or PME. in your tick box for Max measurement tested.
  8. buzzlightyear

    Zs measurements in the Cert column

    What would you put.and see if can get correct.
  9. buzzlightyear

    What is it on this fault

    This for an apprentice 32 amp mcb /63amp RCD 1) no power to the sockets 2) installation resistance all good. 3) contunuty good. 4) no loses conections. 5) mcb not tripped 6)rcd not tripped. 7) all mains on. What is it.
  10. buzzlightyear

    Garden supply on PME system

    If the designer chooses not to use the PME earthing arrangement and decides to install a TT earthing system, special care must be taken to avoid simultaneous contact between accessible metallic parts connected to different earthing arrangements, see Regulation 411.3.1.1 of BS 7671:2018+A1:2020...
  11. buzzlightyear

    Dodgy trade pictures for your amusement! - 1 Million Views!

    It's like a arrow passed through it.
  12. buzzlightyear

    Garden supply on PME system

    What is that tub wood, plastic or metal.
  13. buzzlightyear

    Garden supply on PME system

    National Inspection Council for Electrical Installation Contracting https://dms.niceic.com › ...PDF Electrical design considerations for the electrical supply to hot tubs.
  14. buzzlightyear

    Garden supply on PME system

    No you don't need a earth rod for hot tube. Use the PME system its hot tube class 2.
  15. buzzlightyear

    Help EAL diploma in electrical installation level 3 is recognised in Australia?

    We must be the only country in the world That any body with a screwdriver will be let in to be a sparky More restrictions over their, and I don't blame them.
  16. buzzlightyear

    UK What to do with copies of test certs now I'm retired

    Data protection. Burn them if you can or shred them..
  17. buzzlightyear

    First time doing an EICR on a flat

    If doing a Ze line /earth, what tester are you using.
  18. buzzlightyear

    First time doing an EICR on a flat

    Have they made that cut out to Tncs or is it a a TNS, by looking at the earth met.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top