  1. leep82

    Routing of meter tails

    Yeah im not saying its by any means fool proof, i just feel theres more chance of striking more than just the one conductor when using a T&E
  2. leep82

    Routing of meter tails

    I just feel it would have been a better installation method than using 25mm2 tails. Earlier in the thread it was asked what would be gained from using T&E over the tails, so im just trying to provide some reason for it. Whilst there may not be any relevance to it s far as the regs are concerned...
  3. leep82

    Routing of meter tails

    Because? i absolutely agree. So would a T&E not offer a better chance than the installed ‘ tails ‘. Just trying to justify why T&E might have been better than the tails.
  4. leep82

    Routing of meter tails

    Because?
  5. leep82

    Routing of meter tails

    Without wanting to sound stupid what is tht earthed armour offering ?
  6. leep82

    Routing of meter tails

    I get that, but i wouldnt also rely on the current set up to perform like that either, although more chance with a T&E. Can i ask why a SWA seems to be a preferred method?
  7. leep82

    Routing of meter tails

    Fully agree and as mentioned if it wasnt an install previously started by another electrician i trust i would not have taken the job. I guess im more concerned because of the cable wouldnt you have more chance of hitting multiple conductors in a T&E, say with a nail or screw and in turn...
  8. leep82

    Routing of meter tails

    Fully agree and as mentioned if it wasnt an install previously started by another electrician i trust i would not have taken the job. I guess im more concerned about the use of the double insulated meter tails. Althought they are ran together and at a suitable depth ( 50mm from floor and ceiling...
  9. leep82

    Routing of meter tails

    Yes they are although i didnt install them myself
  10. leep82

    Routing of meter tails

    A seperate cpc would have been run along with the T&E
  11. leep82

    Routing of meter tails

    sorry for the late reply, yes this is a concern. It is a TN system NOT TT so as pointed out earlier in the thread RCD protection not required.
  12. leep82

    Routing of meter tails

    Thanks for the comments guys, would it be Fair point raised and if it was sombody who i didnt know from adam then i would be very reluctant to do so. However i have worked with the electrician who has carried out the work so far and am more than comfortable picking it up from him. As things...
  13. leep82

    Routing of meter tails

    Maybe there isnt. I may be looking for one because its not how i would have done it myself. On the surface it all seems ok. Its just the length of those tails and more the fact that they run through the joists like they do
  14. leep82

    Routing of meter tails

    Would have been another option prior to ceilings being boarded and skimmed although maybe difficult to run a SWA through the joists.
  15. leep82

    Routing of meter tails

    hi all any advice on the following scenario much appreciated. I have taken on a rewire from another electrician whos personal circumstances mean he cant finish the project. Majority of the first fix has been completed including the repositioning of the DB. The original DB was situated inside the...
  16. leep82

    Intruder Alarm External Bell/Strobe problem

    Thanks for the offer, unfortunately im not local tomorrow
  17. leep82

    Intruder Alarm External Bell/Strobe problem

    hi all, as the title suggests i have a problem with an external sounder. Firstly i’ll hold my hands up and say that alarms systems are somthing ive never really got involved with. When i worked direct for a company they used a sub contractor and nkw im self employed i have generally passed any...
  18. leep82

    RCBO neutral/earh leads

    it may just have to be to house the leads as there isnt a great deal of room in the DB for me, its a hager board. Need to be mindful of leaving enough room to terminate the outgoing circuits
  19. leep82

    RCBO neutral/earh leads

    what do you guys do with yours? Currently on a job fitting a 24 way TP&N distribution board where all final circuits are going to be protected by RCBO's. I want the board to look as neat as possible but as you can imagine the number of circuits that i have ( 56 in total ) means the neutral and...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top