Hi everyone.
I’m now 50 and find myself taking twice as long doing things that in my head should not be taking as long.
Not sure if it’s an age thing or a state of mind I also find myself double checking things more.
I know I may be comparing to my younger self, who was bought up on a diet of...
Hi
If a new build has solar and battery fitted, but no paperwork or sign off has been completed, what are the implications?
Do you need a mcs cert for BC sign off like Part P for an install?
I honestly do not believe that an EICR report gets much reading from BC past page 1, after the address ant the word satisfactory has been seen.
In the extent and limitations you could probably put this certificate only covers the correct address and current date and nobody would think anything...
Building control around my area will accept a EICR if there is no Part P sign off so seems pointless registering with a scheme sometimes if its costing you £1200 a year and £4+ per sign off if you can just bang out an EICR for nothing.
Nobody really seems to be following up any work carried out...
Hi all.
Not sure this is the right place to post so will move / delete if needed.
Just wondering if anyone could go back to working with just a standard mobile phone and text messages?
Obviously smartphones can be very useful and I would miss the camera, but just wondering if I could go back to...
Had a quick look this morning as it’s local.
It’s a full rcbo starbreaker installed in the kitchen pantry but unfortunately it’s plastic.
Paperwork he has appears to show it was rewired in 2014.
I recommended that we rush off to Screwfix and grab a split load BG unit to replace the death trap...
Hi all,
Been asked to do EICR on thatched property for insurance purposes, however they will want all C3 codes rectified.
Haven't seen it yet but have been told it was rewired in 2012 so i assume its a plastic CU.
If its in a suitable place then bpg4 suggests this would not need recording on...
I think some of the rates for EICR testing that you see on the web are stupidly low, hope it doesn't turn into what PAT testing is.
I have been behind a few testers who were there under an hour, according to owner or tenant, and they seem to want to change the CU as a cure all for the failed...
If anyone is interested how this turned out.
I did not get the job
I went in about £20.00 per circuit (408 Circuit's) and said I would be there over a month.
They had a quote for £2,200 that they went with, as there were 2 guys and they did it over 4 days!!!
Not sure I could, or would want...
Hi all,
Just wondering what the general situation is with other people on smaller jobs, do you give a quote or estimate to the client before you do any work?
I understand quotes for newbuilds / rewires etc. but smaller bits like replacing smoke alarms or adding a couple of sockets to a good...
I have done quite a lot of industrial testing over the years although they have not had as many boards as this one, I think the most I have had over the past couple of years was a unit with five 3 phase boards in it.
Normally I have a word with whoever is in charge about what needs to stay on...
Hi all,
Been asked to quote an EICR on a fairly large installation.
Approx. 400 circuits that are a mixture of single and 3 phase.
This is across 28 consumer units, in addition to the above there are also 6 distribution consumer units for the submains, and 12 feeder pillar boards (4way)
Building...
Yes in the C50.
Probably been like that for years.
Nothing to do with the fault though, which was one of those flex inside a garden hose that's been buried doing the garden lighting situations.