Definitely agree that you should leave well alone and contact UK Power Networks to sort it out. It is their problem and why should you pay an electrician to do it when a sparky should not be touching it.
It is nothing to worry about and the worst that is likely to happen is compound to be spilt...
You or the client should tell BT where to put the flaming Master Socket. The standard price for a new BT line does not vary with the length of cable run
You should wire 2 3 and 5 if you want the bells to ring. It is good practice to wire all six if using 3 pair cable to CW 1308.
There is no limit to the number of sockets you can wire in but the old rule was that the maximum REN of the phones plugged in should not exceed 4. REN is ringer...
I think that the OP may have put the cart before the horse here. It is a bit like all the snowflakes who go to UNI paying large tuition fees and end up with a large student load and a job filling shel in Tesco’s. You may find a DNO who will take you in as a trainee engineer and after you have...
Blow mates rates! There is no such thing as mates afterwards.
Over fifty years ago I did a complete re-wire of a three bed semi that a mate had purchases in Sutton outer London. This included the garage.
Three months after I had finished he rang me up one Sunday morning and complained that I...
Do not know anything about Germany but did lots of telephone installations etc. How much of the equipment is PORTABLE. Because the P in PAT is for Portable how much of your equipment is actually portable. Most of the stiff I worked on was far from portable unless you include equipment that...
Thanks. Looks like a FCU then as plan was cables from existing SSO to new SSO 1 and cable from SSO 1 to SSO 2 but i will leave that to the sparky.
thanks both of you for your help.
Hi folks, just a query about having two RCDs in series. I want to have installed three new external 2 gang 13 amp SSO to IP66.
I currently have a 100 amp BG CCU installed by an electrician in 2016 with split load and 2 BG 63amp 30mA RCDs labelled ICE/EN 61008. The supply is what we used to...
Does anyone know what the British Telecom Ring Back Code is NOW. It used to be 17070 but that no longer works. You dial the ring back code and then hang up and the exchange rings you back. It used to also tell you what the number of the line is.
I am doing a job at a relative’s house in...
What you need to do is get the DNO to put in a proper three phase supply and necessary meter. One of the first things you need to tell them is the electrical load that you wish to use.
It is going to be expensive. If you are in a really rural area could even need an extension to the high...
You may well take the Micky about using ferrets but many years ago when the CEGB [ the forefather of National Grid ] were laying very high voltage cables under the Seven Estuary they had to install a draw wire into the steel pipes under the bed of the estuary and they got the initial light...
As a member of a local Bowls club for thirty years I can tell you that they are as tight as a duck’s rear end and we all know that this is water tight otherwise the poor old duck would sink.
They only like spending money at the bar and then always complain at the prices which are normally half...
You need a proper duct a minimum of 450mm below surface with warning tape above it. Then run SWA through this duct. If budgets would not stand two poles and a catenary then I can not see that budget will stand a proper duct. Tell customer price for doing a proper job with a duct line...
When I was employed as a Distribution Engineer by a DNO I pulled many a cut out fuse but I would only touch it if the cutout was a modern Bakelite or similar insulated style. Metalclad or Glass Fronted I would not touch with a barge pole if they were live. The only exception was in a major...