Search results

Search results

  1. AyresomeBoro

    CompEx 01 Practical Re-sit

    Hi all, I have a CompEx 01 re-sit this week. I have passed the full course once before and I have received no feedback as to why I have failed the unit this time around, which is very frustrating. I have been through the installation repeatedly and I have a couple of questions: 1. Is a...
  2. AyresomeBoro

    Main Incomer and Meter Mounting

    Picture of existing earth clamp ...
  3. AyresomeBoro

    Main Incomer and Meter Mounting

    Thanks for your quick replies. Apologies, I should have explained the situation a bit more. My background / experience is in commercial and industrial maintenance. I will upload a closer image of the earth clamp tomorrow.
  4. AyresomeBoro

    Main Incomer and Meter Mounting

    Hi all, I've purchased a property recently and I've managed to have look at the main incomer today. The main incomer and meter are mounted on slatted wood (looks like floorboard?). Am I right in thinking these should be fixed onto a flame retardant / non-combustible board? I was going to...
  5. AyresomeBoro

    NVQ level 3 in engineering electrical maintenance

    I completed the EAL NVQ level 2 & 3 in Electrical Engineering Maintenance. I also completed the BTEC Level 3 in Engineering alongside it to make up the ‘Advanced Level Apprenticeship’. Upon completion I was classed as a Maintenance Electrician. I then went on to achieve 17th Edition, City &...
  6. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    I can’t find the Lighting unit on the online shop or in the module list I was originally provided with. Do you have to request it? Cheers. 1568474567 Completed Q1 so far, I will be tackling the rest next week.
  7. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    Finally submitted EEP 3! I now need to choose my final optional unit before the Project. What is the easiest optional unit other than DCS so I can get it over with ASAP? Cheers!
  8. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    Anyone completed DCS Assignment 2, Question 5? Using the information below, produce a set of calibration figures for the control loop TICA1945. T11495 Range = 100 to 420 degrees c TICA1495 SP = PV = 300 degrees c TCV1495 = 30% Struggling with this one can’t find anything similar in the...
  9. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    Just to let you know mate I’ve achieved distinction for the first assignment. As I said, I basically just copied the lesson material. Go for it ...
  10. AyresomeBoro

    Lights not on RCD side of board

    My bedroom light blew today, was only the MCB for the upstairs lighting that tripped. RCD stayed on.
  11. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    I was going to print it out and read it at work. ... 3000+ pages :D
  12. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    Thanks guys I took a short break to start DCS but should really get EEP3 finalized, I'll be in touch soon when I read back over it. Cheers.
  13. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    I am now working as a Process Operator so changed my units slightly and purchased Distributed Control Systems. I have just submitted TMA1 of the DCS unit and to be honest for the assignment I copied diagrams and extracts from the Blackboard lessons. Some of the questions were exactly the same...
  14. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    I'm the same mate, think I have only completed Q1 & Q2.
  15. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    It was about 4 weeks mate.
  16. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    Submitted EEP 1 a few weeks back and just received a distinction. Just EPP 3 to go.
  17. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    I've just recieved a Merit for EEP2 but still struggling with Question 1 on EEP1 !
  18. AyresomeBoro

    Teeside HNC Electrical and Electronic Engineering

    I'm still on EEP1. :confused:
  19. AyresomeBoro

    Does having your compex and/or 2396 design help towards electrical and electronic HNC?

    Just had a reply to say that CompEx can be used for 3o credits at level 4. This means you only have to complete 6 out of the 8 units for the HNC! (still charge you a fee to do this :eek::rolleyes:)
  20. AyresomeBoro

    C.K Tools Competition - Stubby VDE Screwdrivers

    I need a C.K Stubby VDE slim screwdriver 4 pack because it would make life easier when removing circular recessed emergency down-lights from plasterboard ceilings to retrieve the battery pack! :mad:

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc