Hi all,
Got my am2 this week and one thing is making me abit nervous.
Is there a knack to stop play in the in SY cable when using the gland.
I've never used this cable and neither has anyone I work with. Tried to teach myself with YouTube videos, a gland and some scrap cable. Unfortunately...
I hope everyone had a good Christmas. I thought I would take the time to make this post for anyone who is going to take their AM2/AM2s in the New Year. I passed first time back in August completing my Apprenticeship.
First off. I was very nervous about taking my AM2 after hearing people talk...
hi everyone i’ve just taken my am2 and realised im made a stupid mistake on the test sheet the breaking capacity of the breakers i’ve put it in ampeares and not KA so ive put 10,000 in every box when it should be just 10KA will this be a instant fail
I have my AM2S next month, and testing is my biggest weakness by far.
I’ve been asking my company to put me on jobs where there is testing work available but it rarely ever happens. Whenever those opportunities do appear, they are very quickly completed by the experienced sparks on the team...
Hi all, about to put in for my 3rd AM2 attempt, can't work out what I'm getting wrong!
I passed everything 1st time except for DOL starter, feedback given was - "The installed circuit was not completed to a fully functioning standard".
... And exactly the same for my 2nd attempt!
I don't...
Hi guys,
I have my am2 resit this week, I just done the pre assessment day and I was told that the sy cable needs to have a lock nut either side of the gland. So two lock nuts on each side.
So one to lock down the two washers and then one to lock them together in the box...in the videos...
This might come across as a really daft question to people who work with cable tray quite often but as part of my AM2, I am to clip FP200 to the tray using:
P Clip
Nut
Washer
I’m just a bit confused about how this should look and which parts should be on the “inside” where the cable runs on...
Hi Guys
I am currently on the NVQ 2357 on my way for the AM2 and get fully qualified, at the moment i am doing private jobs, on the NVQ 2357 they ask us to provide pictures of
Materials schedules.
Plant and equipment schedules.
contract variations
site instructions
site events/diary.
all...
Hi question whats my best route
ive just done the am2 and past
my nvq has expired as i took a while before completing the am2
i have level 2 and 3 and 18th and the am2
what's the difference between the eal and city guilds route
i know i don't have to do the am2e extra bit
assessor...
resitting Saturday my am2 4 sections a3/b/d/e
swa and sy failed on protective conductors on both
swa i under stand thats the earths i think i used a smaller fly lead from the banjo to the db/ and a earthing nut with the banjo
sy think i used a 1.5mm flylead
so correct me if im...
attempted the am2 march 2022
passed
A1/A2/A4/A5/C
had a lot going on at the time death in family so never got back on this
i have till march 24 they told me end of the 2 year
another £1000 to attempt A3/B/D/E
SWA SY I STUPIDLY used wrong size fly lead size that was the fail only...
Evening all!
im looking at progressing and trying to obtain a JIB gold card but unsure what i need altogher.
i currently have
C&g 2330 level 2
18th edition
C&G 2391-52
HNC electrical engineering
am i right in think all i need now is the nvq3 and am2? i phoned jib yesterday and they wasnt...
Hi,
I'm a little confused confused is someone can shine some light on the amendment 2 way of doing IR.
I know you have to do one 1st fix at 500V DC and then final one at 250V DC when all cables.
What I'm confused about is GN3 states:
"...sometimes these cables are terminated without further...
Hello everyone. I've been reading stories of people failing their AM2 on section B initial verification. I'm going back in my head and I think I forgot to functional test the solar.
The assessor wasn't always in the room, and if he was he wasn't watching us that closely.
My question is, how...
Finished my AM2 the other day, pretty confident with most of it except the testing.
When I done my live polarity, Ze and PFC tests for some odd reason I kept the padlock on the lock off. So whilst doing the tests I had to faff around getting the probes into the terminals as the pad lock was in...
Got my am2 coming up on Tuesday and I know I have to calculate my Zs readings
Maybe I’m overthinking this but am not sure if I need to use the Ze (which is apparently given to me) or my measured Zdb from my three phase panel in the equation. I have heard different answers, would be great if...
I have my AM2 coming up next week but something is puzzling me and I’m hoping someone can help me out.
So there is some SY cable coming out of the DOL into the 3 phase motor. From my understanding they provide 4 core SY.
I’m a bit confused as to where I’m supposed to get the CPC from as from...
I was surfing through one of the electrical training groups on Facebook yesterday and came across this question from an AM2 prep course:
There were 4 points to fill in after that.
Initially I thought of the C1-C3 and FI codes, but then thought that these being the codes for EICR wouldn't be...
thinking now am2 is all about making money from people
right
i have left resits
1 swa and sy
2 knowledge exams
3 testing
4 faults
passed the rest
i went back and done sy swa and s plan heating
i passed s plan only didn't pass swa sy protective conductor i know what i did wrong...
About to re sit testing section of am2. Am I required to test phase rotation at the incoming switch and also the 3 phase socket and motor. Just can't seem to find any clear instructions on what they expect on this test
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc