I have a small camper. I'd like the option to power the distribution center/panel from either shore power or by the AC output from a Jackery solar generator.
I'm thinking to have a two-position changeover switch with one input and two outputs. Input would be from shore power as it comes...
Hi all, got a community center job and the want surge protection, 3ohase in phase for community center and phase for the flat upstairs, question is, do fit surge at the incomming covering both installs or fotfor community center and inenfornflne for the flat ?
Urgent requirement for an electrical engineer to join a data centre project in Sweden Monday.
We will provide you with a 1 bedroom fully furnished apartment, Car, Flights, Visa & €550pd.
Email applications to [email protected]...
Hey everyone - new to this thread so thanks for having me. I have an issue with my DC power in a small truck camper. I have 3 accessories plugged into 5 pin rocker switches on a single panel. I have daisy chained the neutrals together and the positive is fed to the power distribution box (WF8700...
So I have had an enquiry about a large open plan call center with around 150 desks.
Rented office space, each desk has at least 1 pc with 2 monitors.
There is also all the other IT equipment you would expect in a big office.
The office sockets are fed from 2 x bus bar trunking runs under the...
Hi,
Has anyone used or gone through training/ qualification with Access Training Centers?
They appear to offer condensed courses (8-12 Weeks) that can get you certified as a domestic/ commercial electrician.
On their website they mention City and Guild certifications, but don’t list the...
Hi, Looking to get back into the exhibition center build up work, worked in the past at the SECC in Glasgow and others down south.
Anyone on here have any up to date contacts.
Hi Guys,
Mind has drawn a complete blank I've been out of electrics for quite a while now and i'm going to be putting some Ceiling Downlights in my bedroom and was just wondering on the wiring;
Would the attached diagram be correct?
I have a ceiling rose as my main light, So if I was to loop...
My mates just been on, his combi boiler isn't working with the timer so he's asked me to install a separate unit.
First of all is this even possible, and second can anyone recommend a budget programmer that would do it. Think it would need to be wireless programmer unit with a receiver at the...
Not sure if I've posted this in correct section, feel free to relocate if required admin! Anybody know where I can pick up a Potterton EP2002 backpate wiring center? The current one has broken clips at the bottom so current programmer won't clip tightly to it, they currently have it held in...
Hello. I am a newbie that just started working as electrician's mate and I am interested about following an electrician course having the option for weekend attendance. Someone from a college that has the workshop in Luton called me yesterday to arrange an interview to check my eligibility. Is...
Afternoon
Always wondered why lol!!
In older houses- that havn't been rewired or converted into dl's etc- in the bedrooms appear to have the bedroom pendants off center towards the windows...
anyone know the reason lol
Been asked by a customer to quote for a 3 phase 100amp supply to his new build 5/6 bedroom house. His meter by the front gates 135-150m from house. Cable will be buried in ducts, i've done some working out myself (long time since i've had to do this). Using a 70 degree thermosetting cable its...
I am a self builder at the Central heating system stage, I have wired the rest of the house myself but I am stuck with the central heating system, and feel I need a suitable qualified electrian to help me, I am quite happy to pay for his time.
What I am looking for is someone that will sit down...
Hi ladies and gents,
Has anyone any experience of installing lighting control centers who's brains I could pick? I have been asked by a customer who's house I'm rewiring to 'Jazz up his lights' in his living/dining/kitchen area. Not too bad as it is only split into three banks of LED...
Hi there
has anyone had much experience using the sundial wiring center with Central heating systems. I know they are made by honeywell but the stats and 2zone programmer a plumber has supplied me to wire an s plan system are a different make?
Would this pose any problems? And also would the...
Hi every one.
I just joined the site ........
I've just started the Trade Center self learning course and would like to speak to someone in the same position just starting out.
Hope all is going well.
:tree:James
Hi All
I am designing a 110v system for a local workshop. They have speced 20 outlets not all to used at one time. Id think realistacally 40% would be the max.
My question is i have been speked at 15KVA tran with 2 80amp outlets and they say to daisychain 10 sockets from each outlet. They cant...
Hi folks Iknow this topic has been beaten to death on this forum but after reading some of the posts and speaking to some of my co workers I am still a littleconfused, I am aware there is several ways of calculating voltage drop but amstill unsure of when to use the correction factor of 1.2 and...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc