Why does it take Scottish Power less than a day to generate my electricity (and gas) bill from an on line meter reading submission and subsequent demand for payment, but 6 weeks on from my on line FIT submission Im still waiting for payment and have been told that the reading I submitted in the...
Hi All
A customer has had a 12 panel solar system(power one 3kw inverter, sharp panels and a landis generation meter) wired into a spare way of the existing cu. The system has been working fine for 3 weeks untill 3 days ago the supply landis generation meter has not moved although the supply...
my dad in law , has one outside security light and wants me to fit an extra one. this will require a spur off the existing circuit and about 5 meters of cabling on an outside wall. can i do this work or does it come under part p?
Customer has about 50 old ~20W halogen downlights. All open-backed type, many broken GU5.3 connectors.
I can't replace 50 off with fangled all-in type LED lamps because:
1) She will have a fit at the price.
2) There would be too much light (in corridors etc) because ex. 20W halogens are too...
I get my FIT payment invoice from EDF usually about a day or so after reading and payment.
This month I didn't get it and had to chase for it, I wanted it as it covered the 3 months from 1st March to 1st June and as the FIT rate was increased on 1st April I wanted to see how they estimated the...
Hi all,
Has anyone come across this? End client receives a notification from SSE that they are starting to "recover costs" of FiT payments by showing a separate line on bills reflecting a fixed rate of £0.243/kWh. Is this simply their way of splitting out/demonstrating their costs in...
Sorry if this has been asked a hundred times I cant find it, however, I am slightly confused having read FIT payments on the governments website. I had a system and installed in 2011 prior to reduction notice and currently get in the region of 45p per unit which is index linked for 25 years...
For installers really and what approx price would you say for this ?
To add 4 x 280w ( ideally ) or 6 x 180w panels on a new roof (30deg, no shading ) facing due WEST in Cheshire using a 2nd INVERTER and 2nd generation meter to give a further 1.12kwh array to an already existing 2.88kw South...
Just gone live - up to 50kW they are staying the same, with a small decrease over 50kW.
http://www.ofgem.gov.uk/Sustainability/Environment/fits/tariff-tables/Documents1/FIT%20Tariff%20Table%201%20May%202013%20PV%20Only.pdf
Has anyone got the inside scoop on FIT rates after May? Have 1 DNO application in which is due w/c 22nd April and talking to another farm but they are not ready to commit yet so the DNO application probably won't be in in time.
Someone mentioned (maybe GavinA) that it may roll over to August -...
Taken a call from a guy who had an install in April 2011. He has had an email from BG asking him to clarify his TIC/DNC, including make and model of panels.
His MCS cert says DNC at 4kw but he has 18 x 220w (he thinks) panels making 3.96kWp, with an SMA 3800 inverter which is limits the...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc