Hi All
When upgrading a fuse board privately or commercially, if the board is right next to the meter (or within a distance less than 3m's) is a 100amp switch fuse required?
I've seen them installed when CU's are installed more than 3m's away.
But generally most electricians I've seen just upgrade the board and do not install a switch fuse after the meter if within close proximity.
Are they wrong in not installing one?
Does this come up as a C3 on the EICR? And if upgrading many CU's for council should Electricians be notifying them that the Switch's are required?
If they don't spec it should the sparks contractor be telling them they must have one?
When upgrading a fuse board privately or commercially, if the board is right next to the meter (or within a distance less than 3m's) is a 100amp switch fuse required?
I've seen them installed when CU's are installed more than 3m's away.
But generally most electricians I've seen just upgrade the board and do not install a switch fuse after the meter if within close proximity.
Are they wrong in not installing one?
Does this come up as a C3 on the EICR? And if upgrading many CU's for council should Electricians be notifying them that the Switch's are required?
If they don't spec it should the sparks contractor be telling them they must have one?