We are looking at a 100kW field mount system for an individual and have a query regarding the FIT.
The FIT rate is 6.85 but as this installation will have to have an export meter will he get paid the additional 4.64p for everything he exports as well making the actual rate 11.49p/kWh?
The array will be grid connected but will not supply a building (autonomous)
The FIT rate is 6.85 but as this installation will have to have an export meter will he get paid the additional 4.64p for everything he exports as well making the actual rate 11.49p/kWh?