jwulster
Hi All,
I've just had my first commercial system quote for a 40 panel 10kWp system accepted. I was told by my supplier/designer that as long as I kept it beneath 16A per phase, over 3 phases that it was still a G83 application and that I did not need permission from the DNO. Is this the case?
I'm also wondering about planning permission. It is on a slight sloped (so not a flat roof!) sheet metal profiled roof. The panels will be at 15 degrees and will hardly be visible from the road. Any ideas?
I know it is needed for a domestic flat/felt roof but this is neither domestic nor a flat roof.
Thanks in advance...
Jonny
I've just had my first commercial system quote for a 40 panel 10kWp system accepted. I was told by my supplier/designer that as long as I kept it beneath 16A per phase, over 3 phases that it was still a G83 application and that I did not need permission from the DNO. Is this the case?
I'm also wondering about planning permission. It is on a slight sloped (so not a flat roof!) sheet metal profiled roof. The panels will be at 15 degrees and will hardly be visible from the road. Any ideas?
I know it is needed for a domestic flat/felt roof but this is neither domestic nor a flat roof.
Thanks in advance...