14/30 day boiler programming | on ElectriciansForums

Discuss 14/30 day boiler programming in the Central Heating Systems area at ElectriciansForums.net

J

Jakeg1

Iv got a customer with two boilers in a large domestic site, and he wants the two boilers to run alternate weeks as of the large loads and maintenance, just wondering if anyone could pass on a link for a programmer that could do this or know anywhere I can buy the parts to build a small control panel? Cheers
 
Yes it would work, but it's what he's asked for and iv been brought into the job by the plumber, I'm not doing the main wiring, iv just been left a circuit and spur by the electrician, who doesn't know how so won't even try to wire it :/
 
i think i would get a 2 channel 14 day timer and interrupt the switch live going to each boiler (only one on each channel and prog for alternate weeks) most plumb merchants would have them. just me though

no stupid idea i will think again
 
Yeah that's what I originally thought, but asking at local wholesalers they didn't know of a 14 day programmer, il nip into the local plumbers merchant later and see, cheers
 
Yes my original idea was to take the supply from spur, out to heating box and normal controls for pumps, then send the sw live to fire the boiler through the 14 day prog to split between the two boilers? Using heating and hot water alternate weeks?
 
problem with that way is programmer would lose supply every time system not calling for heat/water better for switch boiler live to go through contactor controlled by 14 day timer (powered up 7 days off 7) (do you agree) but cant find one yet
 
could you not do every three and half days with a seven day prog as might be better not leaving boiler off for week anyway?

- - - Updated - - -

nice as above
 
never seen 2 boiler sequencer before looks the kiddie and will save a lot of messing around nice link (snow is there a way i can save links on this site, at moment I am writing them in a book)
 

Reply to 14/30 day boiler programming in the Central Heating Systems area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Hi everyone, If you are looking for reliable EV chargers, check out our top-rated selection at E2GO! ⚡ Please note that all EV Chargers and...
Replies
0
Views
224
  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
1K
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
1K

Similar threads

I generally thought double stack boards were more for situations where a portrait design is better suited to the cupboard - you still generally...
Replies
4
Views
500
You would have thought they'd have a switch to flick on and off to engage an override. Not on each PIR but an actual light switch
Replies
5
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top