C
Chris C
Help please, I have just looked at an installation that has been converted from overhead and rod to PME. 25mm tails from the main fuse to the meter then a 16mm T&E to the CCU. I have been asked to upgrade the CCU to 17th edition, do I need to upgrade the tails to 25mm and the main earth to 16mm? Sorry if this has been covered before but I'm a neewbie.