H
Heisenberg
Just this past week I was doing a job that required 8 dual dry lining boxes and 3 2 gang boxes to be installed. Thought I was being clever by making myself a small cardboard template which I used to mark out the hole size required on the wall. Completely forgot that dual boxes are wider than 2 gangs, and used the same template for those holes too. I felt like a right one, I can tell you :wacko: