I'm a DIYer putting upgrading my electrical service. I need to come into a structure with a 2" schedule 80 PVC.
An electrician friend told me I should use a 2" "sill plate" on the side of the structure. How do I connect the 2" sch. 80 PVC
pipe to the "sill plate"--do I just run the 2" PVC up under the plate and leave it at that?
An electrician friend told me I should use a 2" "sill plate" on the side of the structure. How do I connect the 2" sch. 80 PVC
pipe to the "sill plate"--do I just run the 2" PVC up under the plate and leave it at that?