S
sherbert
Putting in an extra 1.5kWp system to work along side an existing 2.4kWp system installed 6 months ago. Do I need to install an extra generation meter or can i connect up to the existing meter? If using the existiing meter how do i fill out the MCS certificate?
thanks
thanks