2 supplies in 1 property | on ElectriciansForums

Discuss 2 supplies in 1 property in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

Judd

-
Joined
Oct 21, 2017
Messages
142
Reaction score
66
Location
Liverpool
I carried some work out today in a property in a block of flats, just installing a fan in a bathroom. whilst carrying out some tests I noticed an MCB in the DB marked coil. After some investigation and discussion with the owner it sounds like (I can't be certain)
This MCB feeds a contactor in the communal service cupboard which in turn feeds her storage heaters, so effectively her storage heaters aren't fed from her own supply. I couldn't gain access to the service cupboard as it was locked and i couldn't obtain a key at the time.
My question is in the event of a fault could this create a dangerous pd across the casings of the storage heaters?
Cut out was located inside the flat
tn-cs
Thanks
 
What do you mean by a dangerous pd across the casings of the heaters?
The casing will be a metal sheet so the pd between any two points on it would be as near to zero as dammit.
 
Not really getting this, tbh it might be because it's very early and I can't sleep!

Is your question relating to...
A. They potentially could be fed from different phases,
B. Due to the earth coming from different supply cables.
C. Something else?

A. = It would just be like a TP install IF there were off differing phases.

B = As Dave's answer the difference in resistance would be negligible for the PD to ever get that high.
As a quick indication as you didn't have access to the other supply. You could have taken a ELI using a nearby socket then taken it again (same socket) but using the heater as earth. This would have given you an idea of the impedance difference thus you could then work out the potential difference.
 
My issue would be lack of access to the main switch for the installation. If there are two cutouts and each has a separate connection between cne and the main earth(s) then there would also be issuei with the integrity of the equipotential zone. Perhaps that is what the op is referring to.
If there is a current flowing in the cne between the two links then it would be tricky to bond. But a pme install has currents flowing through bonding conductors anyway so bonding them all together would be possible even if not compliant, assuming you could get access to the cutouts and main earth terminals for each.
 

Reply to 2 supplies in 1 property in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
275
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
773
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
779

Similar threads

From the front cover of the manual: Newlec Helpline: 0800 783 6909 https://www.manualslib.com/manual/3408290/Newlec-Nlsh050.html#manual I think...
Replies
1
Views
191
I am a landlord/owner of a flat. I am just about to spur off nearby sockets to provide the additional 24hr supply to new Dimplex Quantum storage...
Replies
0
Views
960

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top