TPES
I have a heating job to do and the spec is 2 x Megaflo tanks (1 for ground floor and 1 for the first floor), There will be 3 boilers also, it was going to be one boiler per floor as per the megaflo's and one as a back up, Now its all 3 boilers will be in use and will be rotated round every 6 months.....
There is also 2 x Wireless room stats (1 for ground floor and 1 for the first floor),
This kind of set up is new to me but ive been told that you see it in schools, collages and hospitals...
Anyone have any idea as to how this will all be connected? the plumber says he's seen a big panel in the past switching all this lot round....
What do you think?