2 x portable work cabin | Page 3 | on ElectriciansForums

Discuss 2 x portable work cabin in the UK Electrical Forum area at ElectriciansForums.net

baazab

-
Joined
Oct 30, 2010
Messages
174
Reaction score
23
Location
uk
Hi everyone need help pls

I need to power 2 x portable work cabin

The meter people came today installed new supply with one meter 25 meters away from the 2 cabin

Each cabin have 3 heaters sockets lights

My question is what size Swa cable can I use

Cable length 35 meters from meter box
 
16mm swa 3core 30 metre
Cleat
60amp metal kmf switch
Glans
 

Attachments

  • [ElectriciansForums.net] 2 x portable work cabin
    Screenshot_20220907-182554_Chrome.jpg
    61.1 KB · Views: 20
  • [ElectriciansForums.net] 2 x portable work cabin
    Screenshot_20220907-182745_Chrome.jpg
    48.6 KB · Views: 14
  • [ElectriciansForums.net] 2 x portable work cabin
    Screenshot_20220907-182652_Chrome.jpg
    59.1 KB · Views: 20
  • [ElectriciansForums.net] 2 x portable work cabin
    Screenshot_20220907-145946_Chrome.jpg
    238.5 KB · Views: 22
  • [ElectriciansForums.net] 2 x portable work cabin
    Screenshot_20220907-182554_Chrome.jpg
    61.1 KB · Views: 20
I don't want to start a huge diversion on this topic but this does seem to be an area where different sparks have different interpretations both as to what's in scope, and what constitutes continuous supervision by skilled or instructed people. If you look back at previous threads it's been discussed before on this forum and the iet forum.

I have some sympathy for the argument that the more structures move, the more relevant section 717 is. For example an outside broadcast unit (in a past life I drove one and was the resident engineer) could move every day and be connected to a different supply daily. That is a good example of something being under continuous supervision too. Which is handy as banging an earth rod in at every venue for the antiques roadshow isn't really practical!

Even if this section was in scope, it's been pointed out there is likely to be someone skilled supervising things on a construction site. So PME would be allowed.
Thanks I appreciate your opinion on this. I understand the exception of the broadcast unit and where for instance a socket in a technicians office could be used for one particular piece of equipment or an instruction given not to drill a wall but the risk of losing the neutral is going to be difficult to monitor.

I suppose it's up to the electrician to complete a designers risk assessment and make there own judgement.
 
The norm is to have a distribution board at source as the site will require other power you connect into this. 16.0 to me is overkill I would use 10.0 straight into the board with 40 or 50A protection.
Good idea respects to you ,
10mm 3 core cheap to buy
You think 10mm 3 core enough for the job from your experience
 
Goasis pls pls if you can help and you want money for helping tell me I will forward to you
If you just want to talk bad pls don't as we not going to achieve anything
Manythanks
Fair enough, I'm good ta. No problem asking for help on something, def worth having a look through the regs book and seeing what you can come up with. If you figure out the what why and how then its an extra skill for next time and you won't have to think about offering someone else money to do it for you.
 

Reply to 2 x portable work cabin in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
378
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
953
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
Issue is certain sizes of cable may theoretically be okay but upon the proper testing when it’s commissioned things like a thing may not test out...
Replies
8
Views
1K
Electric hob/oven range was installed years ago, runs on 2 x B32 MCBs to 'House' (sub)consumer panel, runs to oven on 2 x T&E. Kitchen is being...
Replies
0
Views
292

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top